Home Depot, Biddeford

| |

bidd_hd_1.jpg

bidd_hd_2.jpg
  • Scope of Work:

    Installation of wick drains. Blasting of 160,000 cy of ledge, which was used to process gravels and aggregates for the project. Utility installation consisted of jacking two sleeves under the Maine Turnpike, which enabled the water and sewer lines to reach the site. In addition to excavation and backfill for new Home Depot building, a mile of off-site improvements, including widening, granite islands, signal work, turning lanes and intersection re-construction took place on Rt. 111.

  • Unique Challenge:

    Fast track construction schedule.

  • Owner:

    J.J. Vaccaro General Contractor

  • Engineer:

    Gorrill-Palmer

  • Location:

    Route 111 Biddeford, ME [map]